Bank Name: |
Kuveyt Türk Katılım Bankası |
Ziraa Bankası |
Bank Branch: |
Kıztaşı |
Fatih |
Account Name: |
SEBİL İNSANİ YARDIM DERNEĞİ |
SEBİL İNSANİ YARDIM DERNEĞİ |
Account Number: |
1981382 |
70495672 |
SWIFT Code: |
KTEFTRISXXX |
TCZBTR2A |
IBAN (): |
TR74 0020 5000 0019 8138 2000 01 |
TR17 0001 0004 8870 4956 7250 01 |
IBAN (): |
TR90 0020 5000 0019 8138 2001 01 |
TR87 0001 0004 8870 4956 7250 02 |
IBAN (): |
TR63 0020 5000 0019 8138 2001 02 |
TR60 0001 0004 8870 4956 7250 03 |
IBAN (): |
TR36 0020 5000 0019 8138 2001 03 |
- |
Bank Name: |
Kuveyt Türk Katılım Bankası |
Bank Branch: |
Kıztaşı |
Account Name: |
SEBİL İNSANİ YARDIM DERNEĞİ |
Account Number: |
1981382 |
SWIFT Code: |
KTEFTRISXXX |
IBAN (): |
TR74 0020 5000 0019 8138 2000 01 |
IBAN (): |
TR90 0020 5000 0019 8138 2001 01 |
IBAN (): |
TR63 0020 5000 0019 8138 2001 02 |
IBAN (): |
TR36 0020 5000 0019 8138 2001 03 |
Bank Name: |
Ziraa Bankası |
Bank Branch: |
Fatih |
Account Name: |
SEBİL İNSANİ YARDIM DERNEĞİ |
Account Number: |
70495672 |
SWIFT Code: |
TCZBTR2A |
IBAN (): |
TR17 0010 0004 8870 4956 7250 01 |
IBAN (): |
TR87 0010 0004 8870 4956 7250 02 |
IBAN (): |
TR60 0010 0004 8870 4956 7250 03 |
IBAN (): |
- |
Location
West Bank – Palestine
Project Description
Installing school sunshades made of iron and safety glass in the school yards inside West Bank
to protect students from the fluctuations of weather in summer
and winter and help them performing school activities and morning queues.
Goals
1. Providing a suitable study environment for school students in the West Bank.
2. Maintaining the safety of students while performing school activities in the schoolyards.
3. Support education in Palestine through supporting Palestinian schools with major needs.
Budget
# |
Item |
Count |
Unit |
Unit cost $ |
Total cost $ |
1 |
Iron bases and concrete |
1 |
N/A |
300 |
300 |
2 |
6 inch pipes, 5 mm thickness |
2 |
piece |
110 |
220 |
3 |
Iron stands over the fence, 4 inches galvanized, 4 mm thick |
2 |
piece |
66 |
132 |
4 |
Front ladder made of profile 100/100 measuring 3 mm galvanized |
1 |
piece |
900 |
900 |
5 |
T 16 inch |
6 |
piece |
110 |
660 |
6 |
Profile 4/8 2 m galvanized |
28 |
piece |
28 |
784 |
7 |
Safety glass length 6 m, number 15 |
90 |
Meter |
7 |
630 |
8 |
Safety glass length 5 m, number 9 |
45 |
Meter |
7 |
315 |
9 |
Connecting tiles 20/20 |
4 |
piece |
7 |
28 |
10 |
Lifting costs |
1 |
N/A |
70 |
70 |
11 |
Tiles 15/15 |
6 |
piece |
6 |
36 |
12 |
Welding + jumbo screws + cutting trays + screws |
1 |
N/A |
175 |
175 |
13 |
Working costs |
125 |
Meter |
10 |
1.250 |
One sunshade cost |
5.500 USD |
||||
Project cost (5 sunshahed) |
27.500 USD |